Calgary Bathroom Makeover
This original 1960’s main level bathroom has been transformed into a work of art. The layout was changed to facilitate a larger tub/shower area. In this case the bathroom was also moved over approx 20’ from its original position, from being located at the rear of the home to the middle of the home. Finishings include maple cabinets, granite countertops, tile flooring and a vessel sink. Design Time: 3 weeks Construction Time: 4 weeks Retail Value: $15,000
Kingsland Bathroom #2
This original 1960’s main level bathroom has been transformed into a work of art. The layout was changed to facilitate a larger tub/shower area.